- 相关推荐
英文采购合同
英文采购合同1
合 同 Contract No.BTGL-HITACHI 20xx-01
CONTRACT Date: March 20, 20xx
Revised date:July 14, 20xx
卖 方: 地址
THE SELLER: TEL: FAX:
买 方: 地址
THE BUYER: TEL: FAX:
兹双方同意按下列条款由卖方出售,买方购进下列货物:xxx
(5)装运条款和交货期:于合同生效后8月30日前以海运形式送货到达MOJI港口。
Delivery time(CIF MOJI): After the order in effect via seafreight direct to MOJI seaport in JAPAN, and arriving at MOJI seaport on or before: 30th August 20xx. 最终目的地:
Final destination of Products: 794, Higashitoyoi, Kudamatsu City, Yamaguchi Pref., 744-8061 Japan (6)付款条件: 凭证结算,30天内(以提单日期为准)付清货款。 Term of payment: By D/P within 30 days after the B/L date. The seller’s bank information
Beneficiary: Bank Name: ACCOUNT: SWIFT NO.: ADD.:
Contract No.BTGL-HITACHI 20xx-001 Date: March 20, 20xx The revised date:July 14, 20xx
(7) 保险: 按发票金额110%保一切险及战争险(中国人民保险公司条款)。
Insurance : To be covered by the seller for 110% of invoice value against all risks and war risk as per the clause of
the People’ Insurance Co. of China.
(8) 品质与数量,重量的异议与索赔: 货到最终目的地后, 买方如发现货物品质及/货数量/重量与合同规定不符,除属于 保险公司货船公司的责任外,买方可以凭双方同意的检验机构出具的检验证明向卖方提出异议,品质异议须于货 到最终目的`地起60天内提出,数量/重量异议须于货到最终目的地起30天内提出。
Quality /Quantity/Weight Discrepancy and Claim: In case the quality and /or quantity/weight are found by the Buyer not to
conform with the contract after arrival of the goods at the final destination, the Buyer may lodge a claim against the seller supported by a survey report issued by an inspection organization agreed upon by both parties with the exception of those claims for which the insurance company and /or the shipping company are to be held responsible. Claim for quality discrepancy should be filed by the Buyer within 60 days after arrival of the goods at the final destination while for quantity
/ weight discrepancy claim should be filed by the Buyer within 30 days after arrival of the goods at the final destination.
(9) 人力不可抗拒: 本合同内所述全部或部分商品,如因人力不可抗拒原因,使卖方不能履约或延期交货,卖方不负
任何责任。
Force Majeure: The Seller shall not be held responsible for failure or delay in delivery of the entire or portion of the goods
under this contract in consequence of any Force Majeure incidents.
(10) 仲裁:凡执行本合同或与合同有关事项所发生的一切争执,应由双方通过友好方式协商解决。如果不能取得协 议时,应提交中国国际贸易促进会委员会对外贸易仲裁委员会,根据该仲裁委员会的仲裁程序暂行规定进行仲 裁,仲裁裁决是终局的,对双方都有约束力。仲裁费用除非仲裁另有决定外,均由败诉一方承担。
Arbitration: All disputes in connection with this Contract or the execution thereof shall be settled through friendly
negotiations. If no settlement can be reached, the case shall then be submitted to the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade, Beijing, for settlement by arbitration in accordance with the Commission’s Provisional Rules of Procedure. The award rendered by the Commission shall be final and binding on both parties. The arbitration expenses shall be borne by the losing party unless otherwise award by the arbitration organization.
(11) Other requirements:
1, Dimensions and marks as per the drawing respectively.
2, How to take test sample as per manufactory way..
3, Additional requirements as per requirements in each drawing.
4,Other conditions to IP-5403& LOI No.DVD-83005-001
(12) The buyer’s bank information:
THE SELLER: THE BUYER:
XXX DROUP CO.,LTD XXXXX EAST ASIA LIMITED
TO BE CONTINUED
英文采购合同2
Contract No.:XXX
Sales and Purchase ContractFOR
Manganese Ore
This contract is made and entered into onXX, Feb20xxunder terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/20xx revision) by and between:
The Buyer:
Address:
Tel:
The Seller :
Address:
Tel:
Whereby seller agrees to sell to buyer and Buyer agrees to buy from seller Manganese Ore under following the terms and conditions stipulated below:
Article 1 Commodity
Concentrated manganese Ore
Article 2 Specifications
Concentrated Manganese Ore
Size: 0-5mm (90% min)
% Mn min. 40.0%
% Fe max. 15.0%
% Silica ( SiO2 ) max. 1.0%
% Aluminum ( Al ) max. 4.0%
% S max. 0.20%
% P max. 0.10%
Moisture max. 7%
Article 3 Quantity:
500 MT, partial shipment not allowed.
Article 4 Origin and Port of loading
4.1 Republic of ABC
4.2 Loading port:
Article 5 Packing/Delivery
5.1 In50 kg sack
5.2 Incontainer Shipment, more or less 20 tons.
Article 6 Shipment/Delivery
6.1 500MT(+/-5%)partial shipment not allowed
6.2 Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by seller’s bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confirmation of the delivery schedule.
6.3 The Buyer has the right to appoint the independent surveyor or his representative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.
Article 7 Contracted Price and Values
Price:Mn: 48% and above - USD0.00/%/DMTCFRCY Port, China
40% - 47.9% - USD 0.00 /%/DMTCFRCY Port, China
The Mn content will be average of the joint-inspection testing result at loading port.
Article 8 Payment
8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hong Kong or Singapore, 100% at sight upon presentation of shipping documents.
A. Seller’s Banking Details:
Bank Name :
Bank Address :
Account Name :
S.W.I.F.T. CODE SWIFT :
B. Buyer’s bank issues L/C to the Seller's bank via S.W.I.F.T. wire transfer.
Buyer’s Banking Details:
Bank Name : (will be advised)
Bank Address :
Account Name:
S.W.I.F.T. Address SWIFT :
Article 10 Inspection of Analysis & Weight
The shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.
Article 11 Documents
Seller shall present the following documents to the buyer:
A. Signed Commercial Invoice for 100% of the total cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.
B. Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.
C. Certificate of Origin issued by ABC Department Of Trade or concerned Government authorities, I original and 2 copies.
D. Weight List, showing total weight , 1 original and 3 copies.
E. Bill of Lading, 3 original copies and 3 non-negotiable copies.
Article 12 Force Majeure
The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel the Contract.
Article 13 Arbitration
All disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/20xx or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language.
Buyer Seller
英文采购合同3
产 品 购 销 合 同
甲 方(买方) :
(PURCHASE CONTRACT)
Buyer
:
乙 方(卖方) :Supplier
买卖双方同意成交下列产品,订立条款如下:The undersigned Seller and Buyer agree following transaction, terms and conditions are specified as below:
第一条 定购产品: Art.1 Ordered products:
:
第二条 质量要求及技术标准:
Art. 2 Quality requirements and technical specifications:
2.1按照本合同第一条约定的规格生产产品,质量标准按照生产厂商技术标准。
2.1 In accordance with prescribed products description of Art.1, the quality standard is based on manufacturer’s technical standard.
第三条 发货时间和发货方式:
Art. 3 Delivery time and terms of shipment:
3.1 发货时间:
3.1 Lead Time: 3.2 发货方式: 3.2 Terms of shipment:
第四条 付款方式:
Art. 4 Terms of payment:
第五条 收货和验收条款:
Art. 5 Goods reception and acceptance:
5.1 验收标准:按照本合同第二条约定的质量要求及技术标准。
5.1 Acceptance criteria: according to the Art. 2 Quality requirements and technical specifications of the present
contract
第六条 违约责任:
Art. 6 Liability for breach of contract:
6.1 甲方延期付款的,乙方交付产品的时间可相应顺延,甲方按照延期支付金额的/日向乙方支付滞纳金,直至款项付清之日。甲方延期支付超过三十日的,乙方有权选择解除合同,甲方按照合同滞纳金标准向乙方支付违约金(支付至乙方提出解除日),向乙方返还产品,甲方已经支付的款项作为赔偿,如不足以弥补乙方的损失的,由甲方另行赔偿。
6.1 Should Party A postpone payment, Party B has right to delay shipment date; Party A should consequently pay late fees of 0.5% per day of the contract amount to party B till date of full payment. Should party A defers payment over 30 days, party B may dissolve the contract and Party A, according to above stipulated late fees rate, should pay Party B liquidated damages (until dissolution date released by party B) and Party A should return the goods to Party B. Actual amount paid by party A is considered as a compensation to Party B; party A should compensate the loss of party B additionally if above said compensation is not able to cover all the damage caused.
6.2 乙方按照本合同约定的时间、地点、质量要求和技术标准向甲方提供定购产品,如延期交付的,按照未交付产品金额的 0.5% /日向甲方支付滞纳金。因乙方延期到货给甲方造成的损失由乙方赔偿。(因甲方未按期支付价款导致延期交货的除外)
6-2 Party B should provide ordered goods to party A based on lead time, place, quality requirements and technical specifications stipulated on the present contract. Late fees, charged to party B, of 0.5% per day will be applied on values of goods overdue. Compensation of loss & damage caused by late delivery should be charged
to party B. (except late shipment due to overdue payment by party A)
6.3 甲方未按合同约定收货或无正当理由提出异议拒绝收货的.,乙方将产品运输至交货地点之日视为甲方收到货物和验收合格的时间,由此造成的损失由甲方负责。
6.3 Should party A fails to receive goods or refuse receiving goods delivered without justified or valid reason, the day when goods shipped to stipulated location will be considered as the day of reception and acceptance, party A is responsible for loss & damage caused.
第七条 不可抗力: Art. 7 The force majeure:
战争、动乱、瘟疫、地震、台风、洪水、物体坠落或其他非合同双方责任造成的爆炸、火灾、意外事故和自然灾害。 任何一方由于不可抗力原因不能履行合同时,应在不可抗力事件发生后3日内通知对方,尽力减少损失。不可抗力造成的损失,由双方自行承担。
Definition: war, uest, plague, earthquake, typhoon, flood, falling objects or any other explosion, fire, accidents and natural disasters which are excluded by both parties’ responsibilities of the present contract. Should one party is unable to fulfill the contract due to the force majeure, the party concerned should inform the other party in 3 days from the date of the event and should try all means to reduce loss caused. The damage caused by the force majeure should be born by each party’s own risk.
第八条 争议解决: Art. 8 Dispute resolutions:
双方发生争议的,应协商解决,协商不成的,由非第一和第二方所在地有管辖权的人民法院 裁决。 All eventual disputes should be settled through friendly negotiation. If consultation fails, arbitration should be settled by a jurisdiction court located in a country other than both parties’ ones.
第九条 其他: Article 9 Miscellanea:
9.1 双方应对合同履行过程中的技术信息和商业秘密承担保密责任,如因任何一方未尽此义务导致他方经济损失,应予赔偿。
9.1 Both parties are responsible to maintain confidentiality regarding all technical and commercial information. Economic losses caused by lack of fulfillment of the duty should be compensated by the party concerned. 9.2 本合同未尽事宜或合同变更,经双方协商一致后签订补充合同,效力与本合同一致。
9.2 Any modification or complementary clauses to the present contract should be negotiated and amended
which will have the same valid effect as the present contract.
9.3本合同一式二份,双方各执一份,经双方签字后即生效,传真件亦适用。
9.3 This present contract is in duplicate, one original for each party; effective once signed by both parties. Fax
copy is also valid and applicable.
英文采购合同4
购 货 合 同
PURCHASE CONTRACT
合同编号:
Contract No.:
签订日期:
Date:
签订地点:
Signed at:
买方:
The Buyers:
地址:
Address:
联系人:
Contact:
电话(Tel):
传真(Fax):
邮箱/E-mail:
卖方:
The Sellers:
地址:
Address:
联系人:
Contact:
电话(Tel):
传真(Fax):
邮箱/E-mail:
经买卖双方确认根据下列条款订立本合同:
The undersigned Sellers and Buyers have confirmed this contract in accordance with the terms and conditions stipulated below:
1. 商品名称及规格
Name of Commodity & Specification
2. 数量
Quantity
3. 单价
Unit Price
4. 总金额
Amount
5. 包装
Packing
6. 交货时间
Delivery Time
7. 交货地点
Delivery Place
8. 运输方式
Means of Transport
9. 保险
Insurance
由_______方按发票金额的______%投保__________,加保______从______到______。
To be covered by for % of the invoice value covering additional from to
10. 付款条件
Terms of Payment
卖方收到50%定金后开始生产,发货前买方付清余款。
After the receipt of 50% of the total value payment, the seller shall begin the production and the buyer pay the balance of the total value before delivery.
11. 装运通知
Shipping Advice
一旦装运完毕,卖方应立即电告买方合同号、品名、已装载数量、发票总金额、毛重、运输工具名称及启运日期等。
The sellers shall immediately, upon the completion of the loading of the goods advise the buyers of the Contract No. names of commodity, loaded quantity, invoice value, gross weight, names of vessel and shipment date by TLX/FAX.
12. 交货原则
Delivery Policy
卖方在规定时间内所送货物必须符合订单要求,送错或送少,应及时更换或补货,否则,所带来的损失由卖方全部承担。
The sellers within the prescribed time delivery of goods must comply with the order request, sent to the wrong or the less, should be replaced or replenishment, otherwise, the losses borne entirely by the sellers.
13. 推迟交货和罚款
Late Delivery and Penalty
如卖方没有按照合同规定准时交货,买方同意卖方付给罚款。加入卖方交货期超过7天,买方有权取消合同。取消合同的情况,卖方仍不能延误付给买方上述罚款。
Should the Sellers fail to make delivery on time as stipulated in the Contract, the Buyers shall agree to postpone the delivery on condition that the Sellers agree to pay a penalty. In case the Sellers fail to make delivery later than 7 days, the Buyers have the right to cancel the Contract and the Sellers, in spite of the cancellation, shall still pay the aforesaid penalty to the Buyers without delay.
14. 不可抗力
Force Majeure
如因人力不可抗拒的原因造成本合同全部或部分不能履约,卖方概不负责,但卖方应将上述发生的.情况及时通知买方。
The sellers shall not hold any responsibility for partial or total non-performance of this contract due to Force Majeure. But the sellers shall advise the buyers on time of such occurrence.
15. 争议的处理
Disputes Settlement
所有与此合同有关的争议应通过友好协商解决,如果协商不能解决,根据有关仲裁法则进行仲裁。仲裁应在深圳进行且其结果对双方均有约束力,任何一方均不应向法院或其他政府部门申请以改变仲裁结果。仲裁费由负方负担。
All disputes in connection with this Contract or the execution thereof shall be settled friendly through negotiations. In case no settlement can be reached, the case shall be submitted for arbitration ,in accordance with its Rules of Arbitration. The arbitration shall take place in Shenzhen and the decision of the Arbitration Committee shall be final and binding upon both parties; neither party shall seek recourse to a law court nor other authorities to appeal for revision of the decision. Arbitration fee shall be borne by the losing party. Or the Arbitration may be settled in the third country mutually agreed upon by both parties.
16.文字
Versions
本合同中、英文两种文字具有同等法律效力,在文字解释上,若有异议,以中文解释为准。 This contract is made out in both Chinese and English of which version is equally effective. Conflicts between these two languages arising therefrom, if any, shall be subject to Chinese version.
17. 附加条款
Additional Clauses
本合同上述条款与本附加条款有抵触时,以本附加条款为准
Conflicts between contract clause hereabove and this additional clause, if any, it is subject to this additional clause.
18. 本合同一式两份,双方各执一份,自双方代表签字/盖章之日起生效。
This contract is made in copies, each party holds one, becomes effective since being signed/sealed by both parties.
买方(盖章):
The Buyer (seal):
代表(签字)Representative (signature) :
日期:
卖方(盖章):
The Seller (seal):
代表(签字)Representative (signature) :
日期:
英文采购合同5
Purchase Contract
合同编号(Contract No.): _______________
签订日期(Date) :___________ 签订地点(Signed at) :___________
买方:__________________________
The Buyer:________________________
地址: __________________________
Address: _________________________
电话(Tel):___________ 传真(Fax):__________
电子邮箱(E-mail):______________________
卖方:___________________________
The Seller:_________________________
地址:___________________________
Address: __________________________
电话(Tel):_________ 传真(Fax):___________
电子邮箱(E-mail):______________________
买卖双方同意按照下列条款签订本合同:
The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below:
1. 货物名称、规格和质量(Name, Specifications and Quality of Commodity):
2. 数量(Quantity):
允许____的溢短装(___% more or less allowed)
3. 单价(Unit Price):
4. 总值(Total Amount):
5. 交货条件(Terms of Delivery) FOB/CFR/CIF_______
6. 原产地国与制造商 (Country of Origin and Manufacturers):
7. 包装及标准(Packing):
货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。
The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as "Do not stack up side down", "Keep away from moisture", "Handle with care" shall be stenciled on the surface of each package with fadeless pigment.
8. 唛头(Shipping Marks):
9. 装运期限(Time of Shipment):
10. 装运口岸(Port of Loading):
11. 目的口岸(Port of Destination):
12. 保险(Insurance):
由____按发票金额110%投保_____险和_____附加险。
Insurance shall be covered by the ________ for 110% of the invoice value against _______ Risks and __________ Additional Risks.
13. 付款条件(Terms of Payment):
(1) 信用证方式:买方应在装运期前/合同生效后__日,开出以卖方为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。
Letter of Credit: The Buyer shall, ______ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire ____ days after the completion of loading of the shipment as stipulated.
(2) 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(D/P)方式,通过卖方银行及_____银行向买方转交单证,换取货物。
Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.
(3) 承兑交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,付款期限为____后__日,按即期承兑交单(D/A__日)方式,通过卖方银行及______银行,经买方承兑后,向买方转交单证,买方在汇票期限到期时支付货款。
Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_____ days after the Buyers delivers the document through Seller’s bank and _________Bank to the Buyer against acceptance (D/A ___ days). The Buyer shall make the payment on date of the bill of exchange.
(4) 货到付款:买方在收到货物后__天内将全部货款支付卖方(不适用于FOB、CRF、CIF术语)。
Cash on delivery (COD): The Buyer shall pay to the Seller total amount within ______ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).
14. 单据(Documents Required):
卖方应将下列单据提交银行议付/托收:
The Seller shall present the following documents required to the bank for negotiation/collection:
(1) 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。
Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;
(2) 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份; Signed commercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;
(3) 由______出具的装箱或重量单一式__份;
Packing list/weight memo in ______ copies issued by__;
(4) 由______出具的质量证明书一式__份;
Certificate of Quality in _______ copies issued by____;
(5) 由______出具的数量证明书一式__份;
Certificate of Quantity in ___ copies issued by____;
(6) 保险单正本一式__份(CIF 交货条件);
Insurance policy/certificate in ___ copies (Terms of CIF);
(7)____签发的产地证一式__份;
Certificate of Origin in ___ copies issued by____;
(8) 装运通知(Shipping advice): 卖方应在交运后_____小时内以特快专递方式邮寄给买方上述第__项单据副本一式一套。
The Seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents No. __.
15. 装运条款(Terms of Shipment):
(1) FOB交货方式
卖方应在合同规定的装运日期前30天,以____方式通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
The Seller shall, 30 days before the shipment date specified in the Contract, advise the Buyer by _______ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.
(2) CIF或CFR交货方式
卖方须按时在装运期限内将货物由装运港装船至目的港。在CFR术语下,卖方应在装船前2天以____方式通知买方合同号、品名、发票价值及开船日期,以便买方安排保险。
The Seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _________ of the Contract No., commodity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.
16. 装运通知(Shipping Advice):
一俟装载完毕,卖方应在__小时内以____方式通知买方合同编号、品名、已发运数量、发票总金额、毛重、船名/车/机号及启程日期等。
The Seller shall, immediately upon the completion of the loading of the goods, advise the Buyer of the Contract No., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _________ within ________hours.
17. 质量保证(Quality Guarantee):
货物品质规格必须符合本合同及质量保证书之规定,品质保证期为货到目的港__个月内。在保证期限内,因制造厂商在设计制造过程中的缺陷造成的货物损害应由卖方负责赔偿。 The Seller shall guarantee that the commodity must be in conformity with the quatity,
specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be ______ months after the arrival of the goods at the port of destination, and during the period the Seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.
18. 检验(Inspection) (以下两项任选一项):
(1)卖方须在装运前__日委托______检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托________检验机构进行检验。
The Seller shall have the goods inspected by ______ days before the shipment and have the Inspection Certificate issued by____. The Buyer may have the goods reinspected by ________ after the goods?rrival at the destination.
(2) 发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的'港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或轮船公司的责任外,买方得在货物到达目的港后__日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。
The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the goods. If damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _____ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey.
19. 索赔(Claim):
买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后______天未予答复,则认为卖方已接受买方索赔。
The buyer shall make a claim against the Seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred therefrom shall be borne by the Seller. The claims mentioned above shall be regarded as being accepted if the Seller fail to reply within ______days after the Seller received the Buyer's claim.
20. 迟交货与罚款(Late delivery and Penalty):
除合同第21条不可抗力原因外,如卖方不能按合同规定的时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每__天收__%,不足__天时以__天计算。但罚款不得超过迟交货物总价的____%。如卖方延期交货超过合同规定__天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。
买方有权对因此遭受的其它损失向卖方提出索赔。
Should the Seller fail to make delivery on time as stipulated in the Contract, with the exception of Force Majeure causes specified in Clause 21 of this Contract, the Buyer shall agree to postpone the delivery on the condition that the Seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. The rate of penalty is charged at______% for every ______ days, odd days less than _____days should be counted as ______ days. But the penalty, however, shall not exceed_______% of the total value of the goods involved in the delayed delivery. In case the Seller fail to make delivery ______ days later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract and the Seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the Buyer without delay.
The buyer shall have the right to lodge a claim against the Seller for the losses sustained if any.
21. 不可抗力(Force Majeure):
凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在__天内,给买方特快专递一份由当地民间商会签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续__天以上,买方有权撤销合同。
The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The Seller shall advise the Buyer immediately of the occurrence mentioned above and within_____ days thereafter the Seller shall send a notice by courier to the Buyer for their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the Seller, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than _____ days the Buyer shall have the right to cancel the Contract.
22. 争议的解决 (Arbitration):
凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交中国国际经济贸易仲裁委员会深圳分会,按照申请仲裁时该会现行有效的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。
Any dispute arising from or in connection with the Contract shall be settled through friendly negotiation. In case no settlement is reached, the dispute shall be submitted to China International Economic and Trade Arbitration Commission (CIETAC),Shenzhen Commission for arbitration in accordance with its rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.
23. 通知(Notices):
所有通知用____文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后__日内书面通知另一方。
All notice shall be written in _____ and served to both parties by fax/courier according to the following addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within ____days after the change.
24. 本合同使用的FOB、CFR、CIF术语系根据国际商会《20xx年国际贸易 术语解释通则》。
The terms FOB、CFR、CIF in the Contract are based on INCOTERMS 20xx of the
英文采购合同6
供方:Supplier:
需方: Demander:
签订日期:Date of Signature:
供方向需方提供______ 类产品(具体产品名称、编号、规格及单价等详见报价单),供需双方本着平等互利、协商一致的原则,签订本合同,以资双方信守执行。
Under the principle of mutual equality and benefit, the Supplier is to provide Demander with ______products (refers to the price quotation sheet for the name, code, specification and price of the products). Both parties agree to enter into this contract for execution.
一、合同定义: Definitions:
1、 采购合同:是指包括本合同以及依据本合同所签订生效的相关订单、合同附件和补充规定,以及双方不时签署或确认的工程、计划、规格变更通知等在内的全部书面文件。
Procurement Contract means all written documents, including this contract and the relevant order entered into and validated under this contract, attached files and supplementary regulations to this contract, and such notices as modifications to project, schedule and specification signed and confirmed by both parties from time to time.
2、 价格:指由双方协商确定的产品价格,以双方签字生效的报价单为准。
Price means the price of the products on the price quotation sheet validated and signed by both parities.
3、 产品:指在生效采购合同、订单、报价单或双方签署的规格,质量,维修条款/协议中所列的由供方提供给需方的产品和/或服务,在本合同中,产品与服务统称为产品。
Product means any products and/or services the Supplier provide to the Demander under the effective procurement contract, order, price quotation sheet or specification, quality and maintenance terms and conditions / agreements signed by both parties, and refer to both the products and services in this contract.
4、 生效订单:指需方发给供方并经供方依照双方约定或需方要求的方式在相应时间内进行确认后的,包含产品型号、数量、价格、交货条款、支付条款等内容的正式订货通知,是授权供方按照本合同履行交货义务的文件。
Effective Order means an formal order-placing notice containing such content as model, quantity, price, delivery conditions and payment conditions of the products, delivered from the Demander to the Supplier and confirmed within the corresponding time, by the means agreed upon by both parties or the means requested by the Demander, which is a document authorizing the Supplier to exercise its responsibility to deliver the products under this contract.
5、 需方商标:指需方拥有的“TCL”、“TCL-legrand”、“LEGRAND”或以上文字或图形的任意组合以及需方目前拥有的或现在正在申请的、或将来所有的其他商标或其它标识。
Demander’s Trademark means any name or sign containing either TCL, or TCL International Electrical, or Legrand or any combination of the foregoing which is currently owned by the Demander and application is being lodged or will be lodged for trademark or logo.
6、 产品支持文件:是指任何产品说明书、图纸、电路图、用户手册、市场推广材料、合格证及其他类似的文件资料。
Product Supporting Document means instruction, drawing, circuit diagram, user’s manual, marketing materials, quality certificate and any other similar document information for any products.
二、 采购合同效力: Effect of Procurement Contract::
1、 本合同的条款和条件均适用于依据本合同所制定生效的附则、订单、报价单及补充协议、相关修订书。供方和需方将就需方依据本合同采购的不同产品的价格、技术规定、品质标准及维修服务另行签订附则,作为本合同的补充。
The terms and conditionns under this contract are applicable to supplementary articles, order, price quotation sheet and supplementary agreement and their relevant revisions entered into and validated under this contract. Supplementary articles concerning price, technical specification, quality standard and maintenance service for various products shall be entered into by the Supplier and Demander in accordance with this contract, which shall act as the supplement to this contract.
2、 本合同的签署并不表明需方有义务购买供方的产品,本合同也不限制需方向其他货源采购与供方所提供产品相同或类似的产品。需方采购供方产品的义务仅在生效订单下才对需方有法律约束力。
The signature of this contract does not imply that the Demander is liable for purchasing products from the Supplier, nor restricts the Demander to purchase the products identical or similar to the Supplier’s from sources other than the Supplier. The Demander is only legally bound upon placement of effective order for products from the Supplier.
三、价格及付款:Price and Payment:
1、 需方向供方提供产品报价单格式。供方在双方约定或需方要求的期限内,根据需方所提供的报价单格式填写相应内容并交需方确认(如无另行约定,供方应自收到需方报价单格式之日起三个工作日内将相应内容交需方进行确认)。经需方书面接受的报价单上之价格为正式生效的产品报价,双方应全面履行。经双方确认并生效的几份或数份报价单之间,以最后生效的报价单所载的内容为当前阶段(报价和期间)为生效执行的产品价格(和期间)。对于需方要求提供的成本结构清单,供方需要在报价单的同时按照需方要求格式附带提供相应文档。
The Demander shall provide a price quotation form format to the Supplier. The Supplier shall fill in the price quotation form and send it back to the Demander for confirmation within a period of time agreed upon by both parties or requested by the Demander (unless otherwise agreed upon, the Supplier shall fill in the form and send it back to the Demander with three (3) working days after receipt of the price quotation form format from the Demander). The price on the price quotation sheet accepted by the Demander in writing represents the formally validated product price and shall be complied with by both parties. The content specified in the price quotation form last validated represents the current product price and shall be executed by both parties when a number of price quotation forms have been confirmed and validated in between. The relevant document containing Cost Structure demanded by the Demander shall be provided in the form as required by the Demander.
2、 供方对需方的报价必须遵循诚信的原则,供方不得采取向研发/工程部门报以低价,而向采购部门报以高价等不诚信行为;一旦发生类似情况,需方有权终止本合同并保留向供方索赔的权利。
The Supplier shall provide the price quotation to the Demander on principle of honesty. Upon discovery of such dishonest activities as the Supplier quoting a lower price to research and development department while quoting a higher price to procurement department, the Demander reserve the right to terminate this contract and reserve all rights to claim against the Supplier.
3、 合同产品经需方检验合格入库后,电汇____ 天 或 承兑____ 天(如应供方要求,需方提前支付货款,则供方需承担对应期间的资金利息,双方约定计息标准为年利率6%)。
After the products specified in contract are inspected and checked in the warehouse by the Demander, Demander should execute the payment by T/T (telegraphic transfer) on ____ days or acceptance bill on ____ days (if advance payment is made by the Demander as requested by the Supplier, the interest incurred from the advance payment during the corresponding period is payable by the Supplier at the annual interest rate of 6% as agreed upon by both parties).
4、在合同有效期内,如果单价高于当时市场价的3%,需方有权在任何时间重新审核确认单价。
Demander reserves the right to review the price at any time during the contract in case find that it is above the market price by more than 3% .
四、订单:Purchase Order:
1、 需方给供方下达网上订货单(若无共享网络资源的需下达书面订单),应在订货单中明确交货日期及每次的交货数量,并通知供方;供方应遵守订货单所载内容交货,除非双方事先以书面形式同意变更订货单的约定内容外,供方的交货不得与订单的约定内容有异。
The Demander shall specify the quantity of products to be delivered each time and the delivery date on the online purchase order (purchase order in writing shall be made if the Demander has no access to internet) and notify the Supplier. The Supplier shall deliver the products as specified on the purchase order. The delivered products by the Supplier shall not be inconsistent with the purchase order, unless prior consent is made by both parties in writing.
2、 供方接到订货单后,如是正常订货,供方应于接到订单两日(需方的工作日)以内,如是紧急订货应于接到订单一日(需方的工作日)以内,以书面传真回复需方进行确认;如超出期限无供方的回复,即表示供方同意需方订货单所载的交货要求。供应商确认的交货周期不得超过本协议附件中规定的各项时间期限。
The Supplier shall reply to the Demander in writing by way of Fax for confirmation within two (2) working days (demander’s working day) after receipt of the normal purchase order or within one (1) working days (demander’s working day) after receipt of the emergency purchase order. If no reply is made by the Supplier within such foregoing period, the Supplier is deemed to have agreed the product delivery requirement specified on the purchase order. The delivery time which the supply confirmed can’t exceed the time on the attached files agreed by both parties.
3、 由于市场变化或其他不可预测因素导致需方对产品需求发生变化时,需方可变更或中止相关生效订单,需方应尽快通知供方,具体相关事宜由双方另行协商确定,并形成书面文件。
The Demander may change or terminate the relevant effective purchase order in case that the demand of the products is changed due to the change of the market or other unpredictable factors. The Demander shall notify the Supplier of such change or termination of the relevant effective purchase order in a timely manner. Details arrangement shall be agreed upon by both parties and developed into a written document.
五、交货和包装: Delivery and Packaging:
1、 交货:Delivery:
1.1 除非双方另有约定,本合同的交货是指由供方或供方委托的人员或机构将产品交到需方仓库,与需方仓库责任人办理交货手续,并同时提供有关产品的单证和资料,并承担相应费用(包括但不限于运输、保险及卸货的费用)。
Unless otherwise agreed upon by both parties, delivery under this contract means that the Supplier, or the personnel or institution authorized by the Supplier deliver and turn over the products to the responsible person of the Demander’s warehouse, with provision of relevant certificate and information of the products concerned, and bear the relevant cost (including but not restricted to transport, insurance and unloading cost).
1.2 供方必须满足经(双方)确认的生效订单中交货期的要求,按时交货。当需方要求提前交货时,应通知供方,供方应采取适当的措施,努力满足交货要求;若确实无法满足,应于收到需方通知之日起一个工作日内,以书面形式向需方告知最早的交货时间和数量。
The Supplier shall deliver the products on time as specified on the effective purchase order confirmed by the both parties. If the Demander needs an advance delivery, the Demander shall notify the Supplier who shall endeavor to satisfy such request by taking appropriate actions, or shall notify the Demander in writing of the earliest possible delivery time and quantity within one (1) working day after receipt of the notice from the Demander.
1.3 除非需方要求或同意,供方的交货时间不得提前,否则视为不按时交货,需方有权拒收。
The Supplier shall not deliver the products ahead of the schedule, unless demanded or consented by the Demander. Delivering the products ahead of the schedule is deemed to be Supplier’s failure to make the delivery on time, and the Demander reserve the right to refuse to accept such product.
1.4 因供方原因迟延交货,导致需方不能向第三人紧急出货时,需方有权向其它方采购,并且由此产生的费用由供方承担;且如因此导致需方遭受损失时,供方需赔偿其损失;若因不可抗力的天然灾害所导致的'交货延迟,则供方不须赔偿或负担其费用。
The Demander reserve the right to procure the products from other sources under the circumstance that the Demander fails to make the emergency delivery of the products to the third party due to the delayed delivery of the products from the Supplier who is responsible for any cost incurred from the procurement from other sources. The Supplier shall compensate the Demander for any loss incurred from the delayed delivery of the products which is due to any causes other than force majeure including natural disaster.
1.5 如应需方的要求必须更改订单所记载的订单内容,应由双方协商后,形成书面文件。
Any changes to the content of the purchase order as requested by the Demander shall be agreed upon by both parties and developed into a written document.
2、 包装:Packaging:
2.1 除非另有规定,包装物应由供方提供并自负费用,包装物上的装运标志必须符合需方要求。
Unless otherwise specified, the Supplier shall provide and pay for the packaging materials, and the packing logo on the package shall be compliant with the requirement of the Demander.
2.2 供方应保证所提供的包装物符合运输、产品安全的要求;供方应采用合适的安全措施,妥善包装货物,达到防潮、防湿、防震、防尘等要求;双方对包装方式另有约定的,应遵守双方约定;因包装不符合规定造成产品损坏、灭失或其他损失的责任由供方承担。
The Supplier shall ensure the packaging materials provided comply with the requirement for transport and safety of the products, and shall take all appropriate precautious measures against damp, humidity, vibration and dust. The products shall be packed by the means agreed upon by both parties. The Supplier shall be liable for any damages, losses from the products or any other losses arising from non-compliance with packaging specification.
六、收货及检验: Acceptance and Inspection:
1、 双方应按照约定交货方式进行交货;需方应于供方产品送达约定地点后清点合同产品,核对产品数量、名称、包装等,并办理收货确认手续。
The products shall be delivered to the Demander by the means agreed upon by both parties. The demander shall check for the quantity, name and package of the products as specified on the purchase order for takeover confirmation at the delivery destination agreed upon by both parties.
2、 产品验收按照双方确认的样品、图纸、《检验标准书》、《检验规格书》进行。未约定的验收内容有国家或行业标准的,应符合相关标准;无标准的以满足需方实际需求为准。
The products shall be accepted in accordance with such acceptance criteria as product sample, the diagram, Inspection Criteria, Inspection Specification agreed upon by both parties, or in accordance with national standard or industry standard if no acceptance criteria is provided, or in accordance with the actual need of the Demander if no standard is available
3、 产品验收合格不表示产品质量合格。若供方产品在需方生产或消费使用过程中,因产品出现严重质量问题或存在缺陷而造成需方的直接及间接损失均由供方承担。
The accepted products do not mean quality passed. The Supplier shall be liable for any direct and indirect loss sustained by the Demander arising from serious quality problems or defects of the products found in the course of using or consuming the products supplied by the Supplier.
七、品质保证: Quality Assurance:
1、 除非另有约定,供方交付的产品应符合:①本合同“陈述和保证”及本条款等规定的内容;②经双方确认的产品技术规格,检验标准以及双方不时签发和确认生效的相关修订书,工程、计划、规格变更通知等文件总规定的标准;③生效订单中规定的标准,以及封样样品表示的标准。上述标准之间如有冲突,则按照最新确认的标准执行,无法确定标准确认时间的,按照较高标准执行。
Unless otherwise specified, the products delivered by the Supplier shall be in compliance with: ①‘Representation and Warranty’ and the terms and conditions under this contract; ② product technical specification, inspection standard and their relevant revisions, and the criteria contained in notice of project, schedule and specification modification issued and confirmed by both parties from time to time; ③ criteria as specified on the effective order and as shown in the product sample. Should there be any conflicts among the criteria mentioned above, the criteria last confirmed, or the higher standard shall be executed if the time for the criteria confirmation fails to be identified.
2、 根据需方QA部的要求,供方应当配合《品质保证协议》的签署工作,进行积极协调并达成双方都能接受的共识,促成双方成功签署《品质保证协议》;双方都有认真履行《品质保证协议》的义务。
The Supplier shall proactively cooperate with the Demander’s QA department to facilitate the signature of Quality Assurance Agreement and the generation of consensus acceptable to both parties. Both parties are liable for earnestly executing the Quality Assurance Agreement.
3、 双方将来可对上述内容规定做更明确的补充规定,但该补充规定的标准高于上述规定的或有更具体的标准的,按补充规定执行;低于上述规定的标准的,按上述规定的标准执行。
Both parties may enter into more specific regulations supplemented to the regulations above. The supplement shall be executed if the criteria contained are higher than those of foregoing, or more specific criteria are provided. But the regulations above shall be executed if the criteria contained in the supplement are lower than those of the foregoing.
八、陈述和保证:Representation and Warranty:
1、 供方对其提供的产品享有合法的所有权,同时没有索赔、扣押、抵押或其他行为存在或威胁到供方,以致妨碍到需方对产品使用和销售。
The Supplier is entitled to the ownership of the products provided and there is no existence of any claim, impoundment, mortgage or any other threatened actions against the Supplier, which may lead to prevent the Demander from using and selling the products.
2、 对本合同的执行不会违反与其相关的任何合同条款、责任、法律、法规和法令,产品符合产品生产、储存、销售的强制性法律、法规规定的标准。
The execution of this contract shall not violate any related terms, responsibility, laws, regulations and decrees, and any applicable mandatory laws, regulations concerning product manufacture, storage and sale.
3、 产品是原厂新的且不包含任何用过的或修过的部件,并正常进口。
The products shall be newly-manufactured from the original manufacturer exclusive of any used or repaired components, and shall be imported through normal procedure
4、 供方产品及其产品支持文件不侵犯任何第三方的知识产权,需方不会因使用、销售产品或产品的任何部分侵害任何第三方的知识产权。
The product and its supporting documents provided by the Supplier shall not infringe the intellectual property rights of any third party. Under no circumstance should the Demander be liable for infringement of intellectual property rights of any third party by using, selling the products in whole or in parts.
5、 遵守本合同“价格条款”的有关规定,不进行欺诈性报价。
The Pricing Terms under this contract shall be abided by and no fraudulent price quotation is allowed.
6、 由需方提供给供方用于为需方进行产品制作的物料,仅限于为需方进行生产;供方需提供固定的、安全的仓库进行储存,在其使用前,供方应对该物料的性能、数量、品质等负责,如必要,需承担相关保险的费用。
The manufacturing materials provided from the Demander to the Supplier shall be only used for manufacturing the products. The Supplier shall provide a robust and safe warehouse to store such materials and shall be responsible for the performance, quantity and quality of such materials before the usage, and shall be liable for any cost in association with the insurance if necessary.
7、 关于货品制造上必须使用的模具;
The mold which has to be used for the product manufacturing:
双方需制定模具采购/保养合同,该合同中应包含关于模具价格、付款、所有权、保管、保密、技术协议等内容,双方均需按照此模具采购合同执行。
Mold Procurement and Maintenance Agreement, which contains such content as price, payment, ownership, storage, confidentiality and technology agreements shall be entered into and executed by both parties.
8、 知识产权:Intellectual Property Rights:
8.1 使用许可:除非另有约定,供方向需方提供的本合同涉及的产品并不视为该产品所含有的供方拥有或控制的任何知识产权的转让;但对于需方在加工、组装、使用或销售产品时必须拥有知识产权许可的产品,供方依据本合同有权并已经向需方授予了该知识产权的符合本合同目的的使用许可。
Usage License: the provision of the products from the Supplier to the Demander under this contract is not deemed to transfer any intellectual property rights contained in the products which is owned or controlled by the Supplier, unless otherwise agreed upon. The Supplier reserve the right to grant and has granted the Demander the Usage License for processing, assembling, using or selling the products which are intellectual property rights license required, in line with the objective of this contract.
8.2 需方提供的部件:如果需方提供部件供供方使用以履行本合同,则供方只能将需方提供的部件用于此目的。
Under the circumstance that the Demander should provide a component to the Supplier for the purpose of executing the contract, the Supplier shall only use such component provided by the Demander for such purpose.
8.3 在本合同项下需方提供的任何技术、设计及功能需求,其知识产权和财产权归需方所有,此类技术、涉及或功能仅限于按需方要求移植到合同产品上去。
The intellectual property rights and property rights of any technology, design and functionality provided by the Demander under this contract belong to the Demander and such technology and involving functions shall only be transplanted onto the products as specified on the contract
9、 保密:Confidentiality:
9.1除了那些供方可从公开渠道或以正当途径从第三方获得的信息外,供方对任何从需方得到的与本合同相关的保密信息或需方经营/技术方面的信息,以及需方在交易谈判过程中提供的有关涉及商业秘密的信息,供方在任何时候,即使在本合同终止后,也不得透露给任何人。当需方有要求时,供方应将包含这些信息的所有文件和材料退还需方。
Any confidential information acquired from the Demander or from this contract, or relevant to Demander’s business and technology, and any information involving commercial confidentiality provided by the Demander in the course of negotiation shall never be disclosed by the Supplier to any other person even after the termination of this contract, except for those information which is available in public or formally acquired from the third party. The Supplier shall return all documents and materials containing such information to the Demander, upon request by the Demander.
9.2如根据政府法令或法律程序要求任何一方必须向政府、裁判机构或任何第三防提供上述资料,可按规定提供,但应尽快将此项事实通知对方。
Either party shall notify the other party in a timely manner of the fact that such information mentioned above has been disclosed to the government, supervisory institution or any third party as demanded by the government regulations or laws.
9.3 本合同任何变更、解除或终止均不影响本条款的效力。
The effectiveness of this term shall not be affected by modification, termination or expiration of this contract.
九、违约责任: Liabilities for Breach of Contract:
1、 供方未按照生效订单要求的时间交付产品,应承担逾期交货违约责任,即每逾期一天,供方应支付订单总金额的1%作为违约金。逾期十日仍未交付,需方有权解除该订单的约束力,供方应承担不能交货的违约责任,即支付订单总额一倍的违约金;
Should the Supplier fail to deliver the products by the time as required on the effective order, the Supplier shall be liable for the penalty arising from overdue delivery, namely by paying a penalty of 1% of the sum of payable on the order for every overdue day. Should the delivery is overdue for ten (10) days, the Demander reserve the right to discharge the binding force of the order and shall be liable for the penalty arising from failure to make the delivery, namely by paying a penalty of double that of the sum on the order.
2、 供方应交付验收合格的产品,否则需方有权退货,供方应在5日内重新送货验收,并承担逾期交货的违约责任。若再次验收不合格,需方有权解除该次订单,供方应承担不能交货的违约责任,即支付订单总额一倍的违约金。
The Demander reserve the right to reject any products failed to be accepted by the Demander, and the Supplier shall re-deliver the products replacing those rejected within five (5) working days and be liable for the penalty arising from the overdue delivery. Should the products delivered for the second time fail to be accepted again, the Demander reserve the right to terminate such order and the Supplier is liable for the penalty arising from failure to make delivery, namely by paying a penalty of double that of the sum on the order.
3、 供方未按照订单要求的数量交付产品,应在3日内补齐,并承担相应的逾期交货违约责任。
Should the products as specified on the order fail to be delivered in whole, the Supplier shall replenish the undelivered products within three (3) days and be liable for the penalty arising from the overdue delivery.
4、 需方应按约定付款,否则应承担逾期付款的违约责任,即每逾期一天应支付未付货款总额的万分之五作为违约金。
The Demander shall make the payment agreed upon or otherwise be liable for the penalty arising from the overdue delivery, namely by paying a penalty 5? of the sum of outstanding payment for each overdue day.
5、 如需方确认为免检产品的,由供方出具相关技术资料或品质保证书作为合同附件,若因供方所供产品质量问题给需方带来一切损失均由(供)方承担。
Should the products be deemed to be inspection-free by the Demander, the Supplier shall provide all relevant technical information or quality assurance certificate as the attachment to the contract. The Supplier shall be liable for any loss sustained by the Demander arising from the quality problems of the products provided by the Supplier.
6、 本合同约定的违约金,作为违约的损失赔偿。如约定违约金数额低于实际损失,以实际损失为准进行赔偿。损失赔偿包括合同履行后可以获得的利益,但不得超过违反合同一方订立合同时应当预见到的因违反合同可能造成的损失。
The penalty agreed upon under this contract is deemed to be the compensation for breach of contract. Should the agreed penalty be lower than the actual loss, the actual loss shall be compensated. Loss compensation may be inclusive of the attained benefit after execution of the contract, but shall not exceed the loss possibly incurred from breach of contract which should be foreseen in the time of entering into the contract by the violating party.
十、合同解除:Termination of Contract:
1、本合同任何一方均有权于另一方发生下列情形时解除本合同:
Either party of the contract reserves the right to terminate this contract upon realization of any following circumstances:
1.1 一方迟延履行合同义务,导致另一方的合同目的不能实现的,或者一方迟延履行合同义务,经另一方催告后十天内仍不履行的。
Either party delays exercising its obligation under this contract, which causes the other party’s failure to realize the objective of the contract, or either party still fails to exercise its obligation within ten (10) days after being urged by the other party.
1.2 另一方已经提出破产申请或被他人提出破产申请,或进入其他类似的法律程序的。
Application for bankruptcy has been lodged by the other party or any other party, or similar legal procedure has been underway.
1.3 另一方经营状况严重恶化。The business of the other party is deteriorating.
1.4 另一方有转移财产、抽逃资金、逃避债务的行为。
The other party is found to be transferring its property, removing its capital or evading its liabilities.
1.5 当供方因各种原因要终止供货协议时,需提前3个月书面通知需方,需方根据需要,可以要求供方提供需方3个月的用量。如拒绝生产,则供方需向需方赔偿半年的供货金额。
The supplier should inform demander in advance of 3 months in written when decides to end supplying agreement, and should supply the quantity of the components for demand’s 3 months’ consumption if demand require. If supplier refuses to supply, then supplier should pay a penalty of semi-year’s transaction amount.
2、本合同因任何原因终止或解除后,双方在本合同及其附属文件项下的权利义务立即终止,但本合同及其附属文件项下售后服务条款、保证条款、违约责任条款、争议解决方式条款、知识产权条款及保密条款、以及其他依其性质应当继续有效的条款仍然有效。解除协议并不影响任何一方对因另一方违约或侵权行为造成的损失进行索赔的权利。
The rights and obligations of both parties under this contract and its associating document shall be terminated immediately upon termination or discharge of this contract for any reasons, but any terms concerning After-sale Service, Guarantee, Breach of Contract, Dispute Solution, Intellectual Property Rights, Confidentiality under this contract or its associating document, and any other terms which should remain effective in nature, shall remain in effect. Discharge of contract shall not affect either party to claim against the other party for any loss arising from its breach of contract or infringement of copyrights.
十一、 一般条款:Generality:
1、 本合同的有效期间以双方签订日期为准。
The effective period for this contract is the period entered into by both parties.
2、 未经需方盖章确认或特别授权,需方的采购、技术等人员无权对合同的价格、数量、交期、违约责任、验收等实质内容进行书面或口头承诺;本合同的委托代理人仅具有签署本合同的权利,不作其它授权理解。
Procurement or technical personnel from the Demander has no rights to make any written or oral warranties on the actual content of the price, quantity, delivery date, liabilities for breach of contract, acceptance under this contract, unless confirmed with stamp or specially authorized by the Demander. The assigned representative under this contract is only authorized to sign this contract, with no any other authorization.
3、 只有在得到需方书面同意时,供方可以使用需方商标。
The Supplier is not allowed to use the Demander’s trademark, unless consent in writing by the Demander is attained.
4、 因履行本合同发生异议,由双方当事人协商解决;协商不成的,应以向需方住所地人民法院提起诉讼的方式解决。
Any disputes in the execution of the contract should be negotiated between both Parties. If the Parties cannot resolve the dispute by negotiation, the matter should be submitted to the People’s Court of the Demander’s resident jurisdiction for legal actions.
5、 本合同一式四份,由双方签名盖章后生效,其中供方一份,需方三份。
This contract is in quadruplicate and only validated after signature is made by both parties, with the Supplier in possession of one copy and the Demander in possession of the other three copies.
供 方Supplier 需 方Demander
【英文采购合同】相关文章:
采购合同采购合同01-14
采购中心询价采购合同03-02
采购合同03-08
采购的合同01-14
采购合同..10-31
采购的合同01-14
政府采购中心询价采购合同12-01
餐饮采购合同04-24
采购电器合同05-22
水果的采购合同05-19